Customer reviews
the TSTSNG-8 of LUKOIL-PERM LLC
Dear Konstantin Vladimirovich!
In 2013, the TSTSNG-8 of LUKOIL-PERM LLC was received for pilot operation the vortex EMIS-VORTEX 200-PPD-050 flow converter, head No. 5988 (Chelyabinsk), complete with straight sections and installation kit.
In November 2013, the converter was installed at the well PPD TSTSNG-8 (Baklanovskoye
field).
For a year and a half of operation, the following was revealed:
• stable operation over the entire range of 1-64 m3 / h;
• declared metrological characteristics (error ±1.0%);
• standard sensor mounting (same as DRS mounting);
• the interval between verifications is 4 years;
• there are no failures or malfunctions
The vortex EMIS-VORTEX 200-PPD-050 flow converter has successfully passed pilot
operation, meets the declared metrological and technical characteristics and can be used at the facilities of LUKOIL-PERM LLC.
27.04.2015
Acting Head of the KIPIA Service of TSCNG-8
LLC «LUKOIL-PERM»
V.V. Makarov